中科混凝土搅拌机是一种将水泥、砂石和水混合成混凝土混合物的机器。它主要由搅拌筒、上、下料机构、供水系统、原动机、传动机构、机架、支撑装置等组成。根据工作性质,分为分批(成批)和连续(连续);根据搅拌原理,可分为自降式和强制式。按安装方式分为固定式和移动式;按放电方式分为倾斜式和非倾斜式;根据搅拌筒的结构,可分为梨型、鼓型、双锥型、盘型垂直轴型和圆槽水平轴型。
Zhongke concrete mixer is a kind of machine that mixes cement, sand and water into concrete mixture. It is mainly composed of mixing drum, loading and unloading mechanism, water supply system, prime mover, transmission mechanism, frame, support device, etc. According to the working properties, it can be divided into batch (batch) and continuous (continuous); according to the mixing principle, it can be divided into self dropping type and forced type. According to the installation mode, it can be divided into fixed type and mobile type; according to the discharge mode, it can be divided into inclined type and non inclined type; according to the structure of the mixing drum, it can be divided into pear type, drum type, double cone type, disk type vertical shaft type and circular groove horizontal shaft type.
操作混凝土搅拌机时,应严格遵守操作规程。毕竟,移动混凝土搅拌机是昂贵的,以避免设备故障或人为错误造成的组件损坏。
When operating the concrete mixer, the operating procedures shall be strictly followed. After all, mobile concrete mixers are expensive to avoid component damage due to equipment failure or human error.
混凝土搅拌机启动前,应检查设备各系统是否有异常情况。如发现异常,应及时处理。不要强迫机器对移动的混凝土搅拌机造成进一步的损坏。
Before starting the concrete mixer, check whether there is any abnormality in each system of the equipment. If any abnormality is found, it shall be handled in time. Do not force the machine to cause further damage to the moving concrete mixer.
在混凝土搅拌机正常运行过程中,要经常检查搅拌主机电机温度是否过高,各系统的空泵、管路及管路是否漏油。如果发生这种情况,请停止进程。
During the normal operation of the concrete mixer, it is necessary to frequently check whether the motor temperature of the mixing machine is too high and whether the air pump, pipeline and pipeline of each system leak oil. If this happens, stop the process.
生产完成后,对移动式混凝土搅拌机的输送管道部分进行清洗,避免混凝土残留在管道内,造成管道堵塞或混凝土对管道腐蚀造成的损失。移动混凝土搅拌机关闭时,清洗设备的废水应先排出,以免移动混凝土搅拌机腐蚀。
After the completion of production, the transportation pipeline of the mobile concrete mixer shall be cleaned to avoid the concrete remaining in the pipeline, resulting in the pipeline blockage or the loss of pipeline corrosion caused by the concrete. When the mobile concrete mixer is closed, the waste water from cleaning equipment shall be discharged first to avoid corrosion of the mobile concrete mixer.
The above is a detailed introduction to the inspection items before the start of the concrete mixer. I hope it can help you! To learn more, please click https://www.cnzkjf.com