您好,欢迎光临莱州聚峰机械有限公司网站! 郑重声明 购机 售后 聚峰官微

全国咨询热线

400-879-1999

您的位置: 首页 > 新闻资讯 > 行业新闻
怎么能防止混凝土自上料搅拌机身油箱体积变小?
来源:https://www.cnzkjf.com/ 日期:2020-11-27
1.携带减水剂
1. Carry water reducing agent
减水剂是一种混凝土外加剂,可以减少用于混合的水量,同时保持混凝土的塌陷。它可以随混凝土自上料搅拌机携带,并且可以很好地调整混凝土。但是,参加减水剂时,请记住上野站的实验室里有人。否则,混凝土质量不足,驾驶员必须承受后果。
Superplasticizer is a kind of concrete admixture, which can reduce the amount of water used for mixing and maintain the collapse of concrete. It can be carried with the concrete from the charging mixer and can adjust the concrete well. However, when participating in water reducer, please remember that there is someone in the laboratory of Ueno station. Otherwise, the concrete quality is insufficient, and the driver must bear the consequences.
2.返回工厂检查水箱中的水量
Water volume in water tank returned to factory 2
每次下火机返回机站时,请检查混凝土自上料搅拌机的储水箱中的水量。紧急情况下,请始终保持水箱充满。
Each time the lighter returns to the machine station, please check the water volume of the concrete from the water storage tank of the charging mixer. Always keep the water tank full in case of emergency.
3.出厂前检查混凝土质量
3. Check the concrete quality before delivery
不同的材料可以改变每个混凝土卷轴的质量。如果在安装后留下混凝土,请检查储罐中混凝土的坍落度和易用性,并注意混凝土的过早硬化和分层沉降。
Different materials can change the quality of each concrete reel. If concrete is left behind after installation, check the slump and ease of use of the concrete in the tank, and pay attention to premature hardening and delamination settlement of the concrete.
                 中科搅拌机
4.减少混凝土自上料搅拌机行驶时间
4. Reduce the driving time of concrete from the charging mixer
混凝土的运输距离通常直径在30以内。在离开汽机之前,请规划道路和机辆的交通状况,并尝试减少小型混凝土搅拌机在路上的时间。
The transportation distance of concrete is usually less than 30 km in diameter. Before leaving the turbine, please plan the road and vehicle traffic conditions and try to reduce the time of small concrete mixer on the road.
5.减少损失并优先卸载
5. Reduce losses and give priority to unloading
如果长时间遇到人为或非电阻性因素并导致卸载,则应始终检查混凝土自上料搅拌罐中混凝土的状况。如果发现混凝土开始变硬。请尽快向负责人报告,以免整个箱子被丢弃。
If the concrete is always subjected to a non blocking condition or a long period of time, the concrete should be checked. If it is found that the concrete begins to harden. Please report to the person in charge as soon as possible so as not to discard the whole box.